A factory warehouse with over 30mm of subsidence caused by a failed stormwater system has been successfully restored. Using resin injection and large props, we achieved a 30mm lift, releveling the building to near its original position. Damaged stormwater systems were located with CCTV and will be repaired by our plumbers. Bricklayers repointed cracks, and builders reconnected roof trusses with new brackets. Raise and Relevel managed all contractors, ensuring seamless project delivery and a fantastic outcome for our client.